Updated as of:
PSE&G Solar Program Segments
Q1 Capacity Allocations |
Capacity DC kW |
Capacity Subscribed
DC kW |
Capacity Available |
| Residential |
400 |
258 |
142 |
Non-Residential
|
Non Residential Small
(<= 150 kW)
Non Residential Large
(>150, <=500 kW) |
|
1,000
8,100
|
444
956
|
556
7,144
|
| TOTAL |
9,500 |
1,658 |
7,842 |
- Loan applications will be accepted on a quarterly basis, with eight application periods over a two-year period. The first application period will begin as soon as practicable after BPU approval. The following table shows the initial proposed schedule of quarterly application periods:
Application Period/Capacity Schedule |
Available (MW) |
Class |
% of Total |
Total MW |
Q1 |
Q2 |
Q3 |
Q4 |
Q5 |
Q6 |
Q7 |
Q8 |
| Residential |
17.7% |
9 |
0.4 |
0.6 |
0.8 |
1.20 |
1.50 |
1.50 |
1.50 |
1.50 |
| Non-Residential |
Quarterly
Amount |
100% |
51 |
20% |
20% |
15% |
15% |
8% |
8% |
8% |
6% |
Non Resi
≤150kW |
33.3% |
17 |
1.0 |
1.5 |
2.0 |
2.8 |
2.5 |
2.5 |
2.5 |
2.2 |
Non-Resi
>150kW
≤500kW |
49.0% |
25 |
8.1 |
7.4 |
4.6 |
3.4 |
0.5 |
0.5 |
0.5 |
0 |
| Total |
|
51 |
9.5 |
9.5 |
7.4 |
7.4 |
4.5 |
4.5 |
4.5 |
3.7 |
During each quarterly application period, qualified applications/projects will be accepted on a first-come, first-served basis within each segment
The quarterly allocations of capacity for each segment set forth herein may be increased by up to 10% or 500kW, whichever is smaller, based on the results of the application process for each quarterly application period. PSE&G shall report the actual installed capacities in each segment per quarter as part of its quarterly status reports.
- a. PSE&G may reallocate unused capacity in a segment within a quarterly period to other over-subscribed segments for that same quarterly period. PSE&G will provide notice to the Signatory Parties not less than twenty days before such capacity reallocation between segments. If, in a given quarterly period all three segments are under-subscribed, there will be no reallocation of capacity for that quarter.
b.
After the reallocation of capacity described in Paragraph 12(a) (if any), any unused capacity within a segment will be carried over and added to the same segment in the next quarterly period, and shall not expire.
- If, after any capacity reallocation as described herein, during any quarterly period there is an excess of qualified applications for any segment, PSE&G will establish a waiting list (based on the order the applications were received), and those applications on the waiting list will be first in line for the next quarterly period. However, the size of the waiting list created in any one quarterly period will be limited to the amount of capacity that will be available in the next quarterly period within the same segment. Customers on the waiting list will be given the option to be assigned capacity in a subsequent quarterly period, at the Floor Price in effect at the time.
- Quarter 1 shall be defined as the period January 1, 2010 – March 31, 2010, and shall include the remaining months in 2009 after PSE&G begins accepting applications in the Solar Loan II program.
|